Lightning risk calculator: how often will your building be struck?

Enter the building's size and surroundings and the local flash density. The calculator works out the collection area, how many direct strikes to expect a year and which lightning protection level a first screening points to.

Lightning risk calculatorCollection area, strikes a year and a suggested protection level (IEC 62305)
Sheet
LRC-01
Method
N = Ng x A

The figures update as you type. A guide for planning and briefing, not a design.

Drawing

Collection area AD
-
Direct strikes a year ND
-
On average, one strike every
-
Efficiency needed E
-
Suggested protection level
-

The first question in any lightning protection calculation is how often a building is likely to be struck. IEC 62305-2 (adopted in South Africa as SANS 62305-2) answers it with the building's collection area, a location factor and the ground flash density of the area. This calculator does that part and then applies the simple efficiency method to suggest a protection level.

How the calculation works

Collection area. A building attracts strikes from a zone that reaches three times its height beyond its walls. For a rectangular building of length L, width W and height H, IEC 62305-2 gives the collection area as AD = L x W + 2 x (3H) x (L + W) + π x (3H)², in square metres.

Location factor. Taller things around the building take some of the strikes. CD is 0.25 when it is surrounded by higher objects or trees, 0.5 among objects of the same height or smaller, 1 when it stands alone and 2 when it stands alone on a hilltop or ridge.

Strikes a year. ND = NG x AD x CD x 10-6, where NG is the number of ground flashes per square kilometre per year for the area. The inverse, 1 / ND, is the average number of years between direct strikes.

Suggested level. If the expected strike frequency ND is above the frequency you are prepared to accept (NC), protection is needed, and the required efficiency is E = 1 minus NC / ND. An efficiency above 0.98 points to level I with extra measures, 0.95 to 0.98 to level I, 0.90 to 0.95 to level II, 0.80 to 0.90 to level III and up to 0.80 to level IV. This is the screening method of the older IEC 61024-1-1, still useful as a first look. That standard puts NC at 5.5 x 10-3 a year for an ordinary building, and lower for valuable, crowded, hazardous or essential ones.

Ground flash density in South Africa

South Africa has some of the highest lightning activity in the world. The South African Weather Service's lightning detection network shows the Highveld and the eastern escarpment averaging about 10 to 15 ground flashes per square kilometre per year, with the northern escarpment reaching more than 20 in places. Activity drops towards the west of the country, so the Western and Northern Cape are far lower. Johannesburg is often quoted at around 15, against about 3 for much of Europe.

The presets in the calculator are rough figures for a first look. For a design, read the value for the exact site from the current ground flash density map.

What this calculator does not do

A full SANS 62305-2 risk assessment weighs more than the chance of a strike. It looks at loss of human life, loss of service to the public, loss of cultural heritage and economic loss, and adds the risk from strikes near the building and on incoming power and data lines. It takes into account fire risk (thatch is the obvious one), panic, hazardous contents and existing measures. That needs an engineer or a lightning protection designer, and it is what insurers, municipalities and large clients ask for. Use this page to understand the numbers and to brief them. See lightning risk assessment and design.

Frequently asked questions

Is this a full IEC 62305-2 risk assessment?
No. It calculates the collection area and the expected number of direct strikes the way IEC 62305-2 does, then uses a simple efficiency method to suggest a protection level. A full assessment also weighs the type of loss, fire risk, strikes near the building and on services, and existing protection. Use it to get a feel for the numbers and to brief a designer.
What value of tolerable strike frequency should I use?
The default, 0.0055 a year (about once in 180 years), is the value the older IEC 61024-1-1 method gives an ordinary building with normal contents, normally occupied. The calculator also offers 1 in 1,000 years for valuable contents or many people, and 1 in 10,000 years where a strike would be serious: thatch, flammable or hazardous contents, or services others depend on. A designer sets the real figure from the losses being protected against.
Why does my house come out at level III or IV when the installer says level II?
The screening only looks at how often the building is struck. A thatched roof, people inside, valuable equipment or a hilltop site can raise the level a designer chooses. Many thatch and lodge systems are designed to a higher level than a simple screening suggests.
Where do I find the flash density for my area?
The South African Weather Service publishes ground flash density maps from its lightning detection network, and lightning protection designers use them. The presets on this page are rough: about 10 to 15 for the Highveld and eastern escarpment, and much lower towards the west of the country.

Sources

Formulas and table values as published in these standards and papers. The calculators simplify them for a first look; a designer applies the full method.

More calculators

Free quote request, no obligation

Request quotes for a lightning risk assessment

Fill in the survey sheet the way an installer would on a first visit: the size and height of the building, the roof and the protection class if you know it, or simply how many arresters, plugs, spikes, metres or visits. Installers and suppliers in your area quote you directly.

Site survey sheetLightning Risk Assessment and Design
Sheet
78614
Date
2026-11-21
Scale
NTS

1The job

2The building (optional, it helps the quote)

Elevation with the rolling spherenot to scale

-
-
-
-
-
-
Estimate
-

Geometry and the standard's table figures for the request, not a design.

3Where you are now

4Your list (optional)

  1. 01
  2. 02
Up to 12 lines: rods, masts, arresters, spikes, tape or services.
Needs and options

5Your details

Free and no obligation. By sending you agree that we may share your request with suitable installers, electricians, engineers and suppliers. See our privacy policy.

Get free lightning protection quotes